Acrow Solution Maintains Uninterrupted Access During Bridge Rehabilitation in Brownsburg-Chatham, Quebec (opens original article in a new tab)
Acrow provided a modular steel bridge to ensure uninterrupted access during the rehabilitation of the Henri-Raby Bridge in Brownsburg-Chatham, Quebec. The temporary structure was installed in 2025 to replace an aging bridge closed for safety reasons, allowing continued vehicle and pedestrian traffic. The bridge was assembled by Gelco Construction and will remain in place through most of 2026.
- Acrow designed and supplied a modular steel bridge to maintain access during rehabilitation in Brownsburg-Chatham, Quebec.
- The temporary bridge replaced an aging structure closed in December 2024 due to safety concerns.
- The 180-foot bridge was installed using a crane-assisted method to minimize environmental impact.
Conversation
No comments yet
Threaded discussion is coming next — this is where the community conversation about this story will live.